| Target 1.1 | Eliminate mercury from the site by replacing bubblers with redundant level sensors. |
| Target 1.2 | Implement RO system for boiler pre-treatment to reduce chloride and sulphates for effluent water |
| Target 1.3 | Achieve 0 reportable spills on-site during 2011. |
|
| Target 2.1 | Maintain 0 fire related incidents during 2011. |
| Target 2.2 | Maintain 0 lost time incidents during 2011. |
| Target 2.3 | Achieve 0 medical incidents during 2011. |
| Target 2.4 | Maintain 100% training requirement completion as documented by corporate Health and Safety Coordinator. |
| Target 2.5 | Complete the design of heated safety showers. |
| Target 2.6 | Revise management review format to capture items only needing review on an annual basis. |
|
| Target 3.1 | Achieve 0 exceedances for M.I.S.A during 2011. |
| Target 3.2 | Maintain 0 incidents as measured by T.I.M. during 2011. |
| Target 3.3 | Upgrade CCC management of change process as per Responsible Care protocol. |
|
| Target 4.1 | Hold a minimum of 2 CAP meetings in 2011. |
| Target 4.2 | Communicate with the community on EH&S at least once in 2011. |
| Target 4.3 | As part of the CAER group, partake in the public education program for shelter in place. |